# Question 9616: All-Path Finite Termination and Reachable Nonhalting Cycles

[Return to catalogue page 49](https://ocme.evemisslab.com/en/questions/page/49/)

[← Question derivation index](https://ocme.evemisslab.com/en/questions/) · [Original question batch](https://ocme.evemisslab.com/en/practice/batch-20261013-advance-20261019-r04-computational-model-foundations/#q-20261013-advance-20261019-r04-computational-model-0091)

This teaching derivation has second-context AI mathematical and bilingual semantic review, limited to the model and assumptions stated in this question. It has no human review or new Lean proof and does not promote the original question or MKO to Canonical truth.

R0018-09616 · q-20261013-advance-20261019-r04-computational-model-0091



## Original question and givens

Use the complete finite, possibly nondeterministic transition model S=Fin(6)={0,…,5}, Init=[0], Halt=[5], Step=[[0, 1], [1, 2], [2, 5], [0, 3], [3, 4], [4, 5], [2, 1]]. Normalize sets and ordered transition pairs. Execution stops at a declared Halt state, ignoring all of its outgoing edges. A stuck nonhalting state is not a successful halt; finite prefixes prove no general termination. Give (reachable states, reachable stuck states, reachable nonhalting cycle?, all paths reach Halt?, classification). A reachable cycle takes classification precedence over a stuck state, but retain both diagnostics.


- G001 — Use the complete finite, possibly nondeterministic transition model S=Fin(6)={0,…,5}, Init=[0], Halt=[5], Step=[[0, 1], [1, 2], [2, 5], [0, 3], [3, 4], [4, 5], [2, 1]]. Normalize sets and ordered transition pairs. Execution stops at a declared Halt state, ignoring all of its outgoing edges. A stuck nonhalting state is not a successful halt; finite prefixes prove no general termination. Give (reachable states, reachable stuck states, reachable nonhalting cycle?, all paths reach Halt?, classification). A reachable cycle takes classification precedence over a stuck state, but retain both diagnostics.





## Definition and scope

Use the original question domain, assumptions and cited MKO definitions. This item has second-context mathematical and bilingual review, with the model, answer and every arithmetic step independently recomputed from the original parameters; the source question remains a candidate.


- [mko-computational-model](https://ocme.evemisslab.com/en/mko/mko-computational-model/)





## Step-by-step derivation

S001 · impliesBefore

n=6;raw Init=[0];raw Halt=[5];raw Step=[[0, 1], [1, 2], [2, 5], [0, 3], [3, 4], [4, 5], [2, 1]]

After

Init=[0];Halt=[5];canonical raw Step=[[0, 1], [0, 3], [1, 2], [2, 1], [2, 5], [3, 4], [4, 5]]

Conditions: none

Type the complete finite data and deduplicate directed edges.Retain raw outgoing halt edges as data,but execution stops at halt.Stuck is not successful halt,and one prefix proves no general program termination.

Step identifiers and dependenciesRule: finite_transition_normalization · Uses: G001





S002 · impliesBefore

Init=[0]

After

zero-step reachable=[0]

Conditions: none

Every initial state is reachable in zero steps,including an initial halt.An empty Init has no reachable states.

Step identifiers and dependenciesRule: zero_step_reachability · Uses: G001, S001





S003 · impliesBefore

depth=0;state=0;halt=No;raw successors=[1, 3]

After

expanded successors=[1, 3];newly reached=[1, 3]

Conditions: none

Expand every successor of a nonhalt state,not just one chosen path.Add unseen states only.A halt is not expanded even when raw outgoing edges exist.

Step identifiers and dependenciesRule: reachability_halt_truncates_expansion · Uses: G001, S002





S004 · impliesBefore

completed frontier=[0];depth=0

After

next frontier=[1, 3];all reached=[0, 1, 3]

Conditions: none

The closure is complete only when the frontier empties.Finitely many states and adding only unseen states ensure enumeration terminates,without sampling a path-length cutoff.

Step identifiers and dependenciesRule: complete_finite_reachability_layer · Uses: G001, S003





S005 · impliesBefore

depth=1;state=1;halt=No;raw successors=[2]

After

expanded successors=[2];newly reached=[2]

Conditions: none

Expand every successor of a nonhalt state,not just one chosen path.Add unseen states only.A halt is not expanded even when raw outgoing edges exist.

Step identifiers and dependenciesRule: reachability_halt_truncates_expansion · Uses: G001, S004





S006 · impliesBefore

depth=1;state=3;halt=No;raw successors=[4]

After

expanded successors=[4];newly reached=[4]

Conditions: none

Expand every successor of a nonhalt state,not just one chosen path.Add unseen states only.A halt is not expanded even when raw outgoing edges exist.

Step identifiers and dependenciesRule: reachability_halt_truncates_expansion · Uses: G001, S005





S007 · impliesBefore

completed frontier=[1, 3];depth=1

After

next frontier=[2, 4];all reached=[0, 1, 2, 3, 4]

Conditions: none

The closure is complete only when the frontier empties.Finitely many states and adding only unseen states ensure enumeration terminates,without sampling a path-length cutoff.

Step identifiers and dependenciesRule: complete_finite_reachability_layer · Uses: G001, S006





S008 · impliesBefore

depth=2;state=2;halt=No;raw successors=[1, 5]

After

expanded successors=[1, 5];newly reached=[5]

Conditions: none

Expand every successor of a nonhalt state,not just one chosen path.Add unseen states only.A halt is not expanded even when raw outgoing edges exist.

Step identifiers and dependenciesRule: reachability_halt_truncates_expansion · Uses: G001, S007





S009 · impliesBefore

depth=2;state=4;halt=No;raw successors=[5]

After

expanded successors=[5];newly reached=[]

Conditions: none

Expand every successor of a nonhalt state,not just one chosen path.Add unseen states only.A halt is not expanded even when raw outgoing edges exist.

Step identifiers and dependenciesRule: reachability_halt_truncates_expansion · Uses: G001, S008





S010 · impliesBefore

completed frontier=[2, 4];depth=2

After

next frontier=[5];all reached=[0, 1, 2, 3, 4, 5]

Conditions: none

The closure is complete only when the frontier empties.Finitely many states and adding only unseen states ensure enumeration terminates,without sampling a path-length cutoff.

Step identifiers and dependenciesRule: complete_finite_reachability_layer · Uses: G001, S009





S011 · impliesBefore

depth=3;state=5;halt=Yes;raw successors=[]

After

expanded successors=[];newly reached=[]

Conditions: none

Expand every successor of a nonhalt state,not just one chosen path.Add unseen states only.A halt is not expanded even when raw outgoing edges exist.

Step identifiers and dependenciesRule: reachability_halt_truncates_expansion · Uses: G001, S010





S012 · impliesBefore

completed frontier=[5];depth=3

After

next frontier=[];all reached=[0, 1, 2, 3, 4, 5]

Conditions: none

The closure is complete only when the frontier empties.Finitely many states and adding only unseen states ensure enumeration terminates,without sampling a path-length cutoff.

Step identifiers and dependenciesRule: complete_finite_reachability_layer · Uses: G001, S011





S013 · impliesBefore

reached state=0;declared halt=No;raw successors=[1, 3]

After

status=active-nonhalt

Conditions: none

The halt designation takes precedence.Only a nonhalt with no successor is stuck;one with successors is active.No outgoing edge does not automatically mean successful termination.

Step identifiers and dependenciesRule: halt_stuck_active_are_distinct · Uses: G001, S012





S014 · impliesBefore

reached state=1;declared halt=No;raw successors=[2]

After

status=active-nonhalt

Conditions: none

The halt designation takes precedence.Only a nonhalt with no successor is stuck;one with successors is active.No outgoing edge does not automatically mean successful termination.

Step identifiers and dependenciesRule: halt_stuck_active_are_distinct · Uses: G001, S013





S015 · impliesBefore

reached state=2;declared halt=No;raw successors=[1, 5]

After

status=active-nonhalt

Conditions: none

The halt designation takes precedence.Only a nonhalt with no successor is stuck;one with successors is active.No outgoing edge does not automatically mean successful termination.

Step identifiers and dependenciesRule: halt_stuck_active_are_distinct · Uses: G001, S014





S016 · impliesBefore

reached state=3;declared halt=No;raw successors=[4]

After

status=active-nonhalt

Conditions: none

The halt designation takes precedence.Only a nonhalt with no successor is stuck;one with successors is active.No outgoing edge does not automatically mean successful termination.

Step identifiers and dependenciesRule: halt_stuck_active_are_distinct · Uses: G001, S015





S017 · impliesBefore

reached state=4;declared halt=No;raw successors=[5]

After

status=active-nonhalt

Conditions: none

The halt designation takes precedence.Only a nonhalt with no successor is stuck;one with successors is active.No outgoing edge does not automatically mean successful termination.

Step identifiers and dependenciesRule: halt_stuck_active_are_distinct · Uses: G001, S016





S018 · impliesBefore

reached state=5;declared halt=Yes;raw successors=[]

After

status=halt

Conditions: none

The halt designation takes precedence.Only a nonhalt with no successor is stuck;one with successors is active.No outgoing edge does not automatically mean successful termination.

Step identifiers and dependenciesRule: halt_stuck_active_are_distinct · Uses: G001, S017





S019 · impliesBefore

reachable=[0, 1, 2, 3, 4, 5];Halt=[5]

After

reachable nonhalt graph vertices=[0, 1, 2, 3, 4]

Conditions: none

Inspect cycles only in the reachable nonhalt subgraph.Unreachable cycles and outgoing halt edges do not affect this execution question.

Step identifiers and dependenciesRule: reachable_nonhalt_cycle_scope · Uses: G001, S018





S020 · impliesBefore

peeling layer=0;remaining=[0, 1, 2, 3, 4]

After

vertices with no remaining nonhalt successor=[4]

Conditions: none

Repeatedly remove vertices with no remaining nonhalt successor.A directed cycle cannot be removed this way.Stuck vertices may be removed too,so keep the separate stuck check.

Step identifiers and dependenciesRule: finite_cycle_sink_peeling · Uses: G001, S019





S021 · impliesBefore

peeling layer=1;remaining=[0, 1, 2, 3]

After

vertices with no remaining nonhalt successor=[3]

Conditions: none

Repeatedly remove vertices with no remaining nonhalt successor.A directed cycle cannot be removed this way.Stuck vertices may be removed too,so keep the separate stuck check.

Step identifiers and dependenciesRule: finite_cycle_sink_peeling · Uses: G001, S020





S022 · impliesBefore

peeling layer=2;remaining=[0, 1, 2]

After

vertices with no remaining nonhalt successor=[]

Conditions: none

Repeatedly remove vertices with no remaining nonhalt successor.A directed cycle cannot be removed this way.Stuck vertices may be removed too,so keep the separate stuck check.

Step identifiers and dependenciesRule: finite_cycle_sink_peeling · Uses: G001, S021





S023 · impliesBefore

nonempty residual=[0, 1, 2];deterministic walk=[0, 1, 2, 1]

After

reachable nonhalt cycle=[1, 2, 1]

Conditions: none

Every residual vertex has a residual successor.Following the least successor in a finite set repeats a vertex and yields an actual cycle.A path can keep following this cycle,so an available halt exit does not make all paths halt.

Step identifiers and dependenciesRule: explicit_reachable_cycle_witness · Uses: G001, S022





S024 · impliesBefore

reachable stuck=[];reachable nonhalt cycle=Yes

After

all paths reach Halt=No

Conditions: none

In a finite model an infinite nonhalt path repeats a state and forms a cycle;a finite maximal nonhalting path ends stuck.Exclude both to ensure every path reaches Halt.Empty Init is vacuous;this does not establish termination of arbitrary infinite-state programs.

Step identifiers and dependenciesRule: finite_all_paths_termination_joint_gate · Uses: G001, S023





S025 · impliesBefore

cycle=Yes;stuck=[]

After

classification=reachable nonhalting cycle

Conditions: none

When cycle and stuck coexist,the label prioritizes the cycle while the earlier field retains all stuck states.Priority does not erase the other diagnostic.

Step identifiers and dependenciesRule: cycle_classification_precedence_without_erasing_stuck · Uses: G001, S024









## Reverse checks


- S025 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S024 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S023 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S022 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S021 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S020 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S019 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S018 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S017 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S016 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S015 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S014 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S013 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S012 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S011 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S010 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S009 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S008 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S007 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S006 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S005 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S004 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S003 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S002 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.
- S001 · premise_and_result_audit — Check against the original data and this step's premises; a one-way implication is not an equivalence.





## Result

([0, 1, 2, 3, 4, 5], [], Yes, No, reachable-nonhalting-cycle)

The full substitutions and premise checks give the original answer; source identity,format and status are unchanged.





## This question review and source binding

Review date: 2026-10-26

Original questions, answers, step expressions, numeric ASTs and historical records are retained. Source candidate labels remain historical and are not overwritten as formal proof.

Source hashes and review receipts
- input commit: 0f7be61e2c22317a4075561dc822c87d881a50db
- original question SHA-256: 181afaa65a72a8827743185a83886de8a82f365887c7b7d10f2101eeb3ba90ac
- candidate record SHA-256: b48f39e83679c826cb0d21c9d0ea75da49477cad82757bf53ea8b572b8a78993
- semantic review receipt SHA-256: bd35da62087a15d6b89b45585dc46e89b9efbe097cba7b3c707b5030496f013c
- question-first witness SHA-256: fab45a10d8ac95c7d61d32e47d1bdd3ca862c17c3289a6bf4b01d4dc9492fbb6
- Lean: NOT_RUN · human review: NOT_PERFORMED

[Same-source full JSON](https://ocme.evemisslab.com/data/question-derivations/questions/q-20261013-advance-20261019-r04-computational-model-0091.json)




